spanish_const_13
by Tim Alatorre
-
Posted on May 27, 2009
-
-
Here is a better shot of the floor beam rebar and formwork. No formwork is setup against the two adjacent buildings. A one inch piece of foam will be set against the building before the floor is poured. An edge form is set up around the elevator shaft and the building perimeter.